TWO WOODYARD TRAGEDIES IN ONE DAY OF PROCESSING!

Running the Eastonmade 22mb is a turd gets tossed your way and you have to deal with it! The drive chain on the elevator jumped a gear and it got out of sync so we had to do a fix on the fly today to complete the job of filling the trailer with boiler wood. And then the bar could not cut through some tough logs fixing!
Back to Top