SLANTING SLIPOVER - increasing and decreasing techniques
M1R (English), udt-h (dansk), Zun-re (deutsch), økn-h (norsk), ö1h (svenska)
= Make 1 Right. Work an increase by inserting the left needle under the strand between the stitches from back to front and knitting it
M1L (English), udt-v (dansk), Zun-li (deutsch), økn-v (norsk), ö1v (svenska)
= Make 1 Left. Work an increase by inserting the left needle under the strand between the stitches from front to back and knitting it through the back loop
p2tog tbl (English), 2 dr vr sm (dansk), 2 li verschr. zus. (deutsch), 2 vridd vr sm (norsk), 2 am vr tills (svenska)
= Purl 2 together through the back loop (twisted stitch)
1 view
65
16
4 years ago 00:02:30 1
SLANTING SLIPOVER - increasing and decreasing techniques