The Quay Wall construction at MPS using Caissons cast on land

The Quay Wall at the new Tema Port Facility is built with “Caissons” A trench to receive the 74 caissons is dredged in the seabed 19m deep. The caissons are cast on land with each completed unit using 1000 cubic metres of concrete.
Back to Top