[Engineering Train on NEW TNMP Tracks] SMRT Trains - KHI C151 [081/082] [Expo → Tanah Merah]

Date filmed: 20 May 2024 Time of recording: 1809hrs Towards: Tanah Merah Train Model: Kawasaki Heavy Industries C151 (GTO-VVVF Variant) Train Run: 102 → 101 Depot of Origin: Changi Depot Final Destination Depot: Changi Depot Carriage filmed at: 1081 A4/B4 AM/PM/Full Day: Full Day Service → Full Day Late Night Service This video features a KHI C151, 081/082, which is from CHD to serve EWL for the whole day, from CG1 Expo to EW4 Tanah Merah. Note that at around 1:06 and 2:34, you would see 2 engineering train at 2 different sections within new TNMP (Tanah Merah Modification Project) tracks that will serve the EWL (new platform), CGL and the new East Coast Integrated Depot (ECID) in 2025. Probably installing something that requires the locomotive or something else? But cool to see the locomotives during the daytime! Also all the trains between Simei and Tanah Merah (Westbound) need to enter Tanah Merah in ATPM (Auto Train Protection Mode) as seen by one train near Tanah Merah being paused outside waiting to enter. Strong Motor can be heard on car 1081 A4/B4. Since 081F was leading, the strong motor was louder when it was decelerating.
Back to Top