This is how I assembled my GEET reactor - Part I .
--------------------------------------------------------------------
1“ outer pipe and 1/2 inner pipe, black seamless steel, with T-Pieces at the ends (1“, 3/4“, 3/4“). The inner pipe goes through both T-pieces.
I have checked the inner and outer pipe magnetic signature before and wrote it on the pipes, to make sure, that I assemble it correctly.
Tube lenghts in this case:
inner tube: 340 mm
outer tube: 200 mm
----------------------------
Edit (September 2nd, 2010):
This reactor might be too short. If you start experimenting with such kind of reactor then make it approx. 75 mm longer than above stated. (inner tube: 415 mm, outer tube: 275 mm)
65 views
0
0
1 month ago 00:47:35 1
How to Sew a Little Winter Gnome “Snowy“ in a Cozy Sweater | Step-by-Step Tutorial
1 month ago 00:01:55 1
𝐓𝐞𝐫𝐦𝐢𝐧𝐚𝐭𝐨𝐫 𝟐: 𝐓-𝟖𝟎𝟎 𝐋𝐢𝐟𝐞-𝐒𝐢𝐳𝐞 𝐁𝐮𝐬𝐭 𝐔𝐧𝐛𝐨𝐱𝐢𝐧𝐠
2 months ago 00:01:00 3
Age of Respair - Announce Trailer | Stronghold Inspired Castle Builder on UE5
2 months ago 00:29:15 1
I 3D-Printed a Glock to See How Far Homemade Guns Have Come
2 months ago 00:21:52 1
UNGLAUBLICH - Newsticker, Eilmeldungen und der ganze Rest !
2 months ago 00:02:04 2
The Sticky - Official Trailer | Prime Video
2 months ago 00:17:10 1
Honda factory tour - Production in Japan plant
2 months ago 00:03:12 1
1993 Nissan Skyline Stock #1971-SCT
2 months ago 00:02:02 193
Nimrods: GunCraft Survivor - Official Early Access Release Trailer