A small model dam, made up of sand and gravel. Water poured behind it, the line of saturation seen moving through the dam. Until failure of the dam.
This was constructed by school children as part of an open-day and shows them a dam burst or dam collapse.
An interesting civil engineering project.
3,960 views
103
29
1 month ago 00:03:04 1
Зомб - #ДелаемФлекс (2017)
1 month ago 00:13:43 1
Типичные задачи junior разработчика в компании | Как работают джуниоры? (мой опыт)